Skip to the content
Tilt & Silicon Survey

Resources for Deciding Whether a Home Is Ready for Solar

Work through this page with an inspection report in hand, and leave with a direction rather than a sales pitch. The helper asks five questions a reader can answer from the report or from memory. It ends in one of three plain directions. Its reasons and assumptions are printed under the result, so the reader can see what it rests on. Under the helper you will find what each question checks and the points to settle before a proposal arrives. The last part covers the places where people usually get stuck.

Working through a home's readiness, in order

Take the five questions in order, because each one narrows the next. Start with the roof and the panel, since they settle most of the answer. Answer from the report wherever it names an item, and from what you can see where it does not. The result is a next step, not a verdict on any particular system. The assumptions printed under each result mark where it stops applying to a home. Keep the report beside you while you answer. The helper gives a reader a direction to take into a conversation with an installer or an inspector.

Five questions on readiness for solar

Answer all five questions, then show your result. The tool gives general guidance from five answers and no more. It does not price a system, estimate savings or check your home. Your state's current programs are not built in, so check them separately. Each question takes one answer, and you can change an answer before you show the result. Nothing you enter here is sent anywhere.

How is the roof described in the report?
How much shade reaches the best part of the roof?
What does the report say about the panel and wiring?
Do you own the home, or rent it?
How long do you expect to stay?

What the helper counts, and what it leaves out

What each question is checking, and why an inspector asks

Each of the five questions stands for one item an inspection report can settle. The roof and the panel come first because a defect in either changes the order of the work. Shade shows how much of the roof can carry panels usefully at all. Tenure decides who can make the change, and the plan to stay decides how much the terms of a contract matter. Together they point to one of the three directions. The result shows which answer pushed it that way.

Close-up of a solar cell with metal contact lines and a sun flare Generated illustration of a homeowner standing in front of a house with rooftop solar panels

Where people usually get stuck

The first stall is a report that lists an item without ranking it. Ask the inspector which findings need repair now and which need monitoring. Read the summary before the detail, if the report has one. An item marked for monitoring is not the same as one marked for repair. The helper separates minor wear from recorded damage for the same reason.

The second stall is a proposal that arrives before the roof and panel have been checked. A proposal sized to an unchecked roof can put the work in the wrong place. Ask whether the installer has seen the roof and the panel rating in person. Ask whether the proposal names the capacity it assumes. A proposal that cannot name its assumptions is not ready to compare.

The third stall is a subscription that looks simple. Shared-subscription terms differ in how credits are shared, how long the agreement runs and how it ends if you move. Read those terms before you sign, and ask for any term you do not understand to be explained in writing. Compare two offers on the same terms rather than on the headline. Check your state's current program before you rely on any incentive an offer mentions.

Additional resources